|
|
| ORIS AUTOMOTIVE PARTS ALABAMA LTD. COMPLETED 2003 | POSTED: 07/06/2004 | | SIZE: ft3 |
A MANUFACTURING FACILITY IN BESSEMER ALABAMA. TODAY, MORE THAN 15
PERCENT OF ALL INDUSTRIAL BUILDINGS NATIONWIDE, RANGING FROM 5,000 TO
1.5 MILLION SQUARE-FEET , ARE TILT-UP.
THE GENERAL CONTRACTOR RECIEVED THE 2003 ABC EXCELLENCE IN CONSTRUCTION AWARD FOR THIS PROJECT. | | ORIS AUTOMOTIVE PARTS ALABAMA LTD. COMPLETED 2003 | POSTED: 07/06/2004 | | SIZE: ft3 | THIS
MANUFACTURING FACILITY IN BESSEMER ALABAMA HAS APPROXIMATELY 148
PANELS, FOR A TOTAL OF 83,374 SQUARE FEET OF PANEL SURFACE AREA. | | FEDERAL EXPRESS - IRONDALE , ALABAMA | POSTED: 07/06/2004 | | SIZE: ft3 | THIS PROJECT CONSISTED OF 58 TILT-UP PANELS, COMPLETED IN 2001
| | PLASTIPAK PACKAGING, INC. BESSEMER ALABAMA | POSTED: 07/06/2004 | | SIZE: ft3 | A
MANUFACTURING & DISTRIBUTION FACILITY IN JEFFERSON METROPOLITIAN
PARK CONSISTED OF THE FOUNDATIONS, 196,717 SQUARE FEET OF SLAB ON
GRADE, AND 103 TILT-UP PANELS. THIS PROJECT REQUIRED THE RELOCATION OF
10 PANELS. | | PLASTIPAK PACKAGING, INC. COMPLETED 2003 | POSTED: 07/06/2004 | | SIZE: ft3 | THE GENERAL CONTRACTOR RECEIVED THE FOLLOWING AWARDS FOR THIS PROJECT -
2003 ABC EXCELLENCE IN CONSTRUCTION AWARD 2003 BUILD ALABAMA AWARD | | WALTON BUILDING "C" NASHVILLE , TENNESSEE | POSTED: 07/06/2004 | | SIZE: ft3 | THIS PROJECT CONSISTED OF 38 TILT-UP PANELS , COMPLETED IN 2000 | | BRUNO'S CAPITOL BUILDING BIRMINGHAM, ALBAMA | POSTED: 06/25/2004 | | SIZE: ft3 | MULTI LEVEL SHORING WORK | | FRITO LAY - CHATTANOOGA , TENNESSEE | POSTED: 06/25/2004 | | SIZE: ft3 |  | | WALDEN BOOKS - LAVERNGE, TENNESSEE | POSTED: 06/25/2004 | | SIZE: ft3 |  | | THREE OAKS INDUSTIAL PARK - LAVERGNE, TENNESSEE | POSTED: 06/25/2004 | | SIZE: ft3 |  | | BUFFALO ROCK - MONTGOMERY , ALABAMA | POSTED: 06/25/2004 | | SIZE: ft3 |  | | OAK MOUNTAIN HIGH SCHOOL - PELHAM ALABAMA | POSTED: 06/23/2004 | | SIZE: ft3 | 
| | OAK MOUNTAIN HIGH SCHOOL - PELHAM ALABAMA | POSTED: 03/16/2004 | | SIZE: ft3 | THE
USE OF TILT-UP PANELS IN THE GYMNASIUM AND CAFETERIA IN LIEU OF
CONVENTIONAL BLOCK ARE GOOD EXAMPLES OF EFFICIENCY, DURABILITY , SPEED
AND LONG-TERM VALUE OF TILT-UP CONSTRUCTION . THE METHOD IS FAST
GAINING ADVOCATES FOR EVERYTHING FROM THE TRADITIONAL WAREHOUSE AND
INDUSTRIAL FACILITES TO OFFICE BUILDINGS, CHURCHES, MOVIE THEATERS,
SCHOOLS AND RECREATION CENTERS. |
|